Worthys were recently nominated as the term maintenance at The RBWM for for a four year period. We are employed to carry out term maintenance and repair on schools, offices, community centres etc.
We operate this contract on a 4 hour, same day, 24 hour, and weekly call out basis depending on the urgency and nature of the works on site.
All our staff are trained in all aspects of reactive maintenance, and visit site with fully sign written vans, staff uniform, and personal identification.
Seen below is an ongoing list of the places in the borough and with the amount of call outs we completed. This is updated weekly.
All Saints Ave Call outs 2 | 1 ECO. Board up broken window. Return to HORG | | 2 Board up all windows |
|
Altwood secondary school Call outs 4 | Remove rain water outlet and connect outside | | Repairs to drain run identified in previous order | Excavate drain run to identify problem Leaking flat roof above electrical mains intake cupboard. Alwyn Infant & Nursery School Call outs 1 Roof leak to boiler house |
|
Boyne Hill Infants & Nursery Call outs 11 | ECO. Board up 1 door + 1 window on Ground Floor | | Board up ground floor rear window | | ECO. Board up ground floor window at rear | | ECO. Re-board ground floor rear windows | | Re-board ground floor window at rear of building | | ECO. Board up rear window and door | | Board up 2 no. windows in conjunction with WB 11723 | | Board up side window and boiler house door | | re-secure rear doors again | | re-secure rear doors |
|
Brocket Pupil Referral Unit Call outs 2 | repair / replace wooden panel to 2nd door on left after main entrance' doors Remove wall tiles, replace with MDF |
|
Brunel Centre Call outs 4 | ECO. Leak to pipe under urinal in the service users toilet | | Investigate / rectify waste to service user toilet which is leaking | | ECO. Board up dining room window. Return to HORG | | Leaking Ppe Adjust fire door to room 10 |
|
Burchetts Green Infants School Call outs 1 Broken glass to double glazed front door |
Castle Hill Y&C Centre Call outs 6 | ECO.Board up 2 no. doors. 1to side 1 to rear | | ECO. Board up 2 doors. To gym and theatre | | ECO. Re-secure wooden door to the rear of the building. Meet Nurullah on site | | ECO. Paint scaffold in anti climb paint | Remove 2 no, pieces of metal 0.5m up from pavement from a brick wall. | ECO. Re-secure rear ground floor door |
|
|
Community Mental Health Team Call outs 1 | Adjust sticking UPVC Door |
| Wooden door from garage will not open when closed. | | S&F replacement lock to wooden door to clinic | | Fault with kitchen door. (will not remain closed) | | Drill out lock in Bridget Fairbairn's Office Desk | | Overflowing urinal | | Middle toilet to ladies not flushing nor cistern filling | | Window problem by Lee Grant's desk in main office | | Rectify faulty desk drawer to managers desk |
|
|
|
Cookham Dean Primary School Call outs 3 | Leak in girls junior toilets | | ECO. Cold tap keeps running to girls keystage 2 toilets | | Broken flush mechanism to disabled toilets |
|
Cookham Library 4690 Call outs 2 | Investigate noisy pipework. Leak to pump No.1 and blue valve above | | Leak to underside of toilet cistern in ladies toilet, left hand cubicle |
|
Cookham Nursery Call outs 3 | S&F 1 no. child proof lock to double cupboard | | Supply and Fit 3 white tiles to sink by main toilets | | Repair / replace door handle to wooden door to Elmer Room |
|
Cookham Rise Primary school Call outs 8 | Blocked urinals in KS1. after 3.30pm only | | HORG 1 pane to reception at high level | | Staff toilet cisterns not filling up | | ECO. Clear blocked urinals in Key Stage 2 | | Borad / make safe metal window. return HORG | | Continuously running overflow from staff ladies toilets Unblock KS2 disabled toilet |
|
Cox Green Community Centre Call outs 8 | Ladies toilet window will not open | | S&F new locks to all windows | | ECO. Board up window in meeting room. Reglaze. Broken glass to be kept for evidence | | Price for drainage works | | Constantly running overflow at rear of building near to boiler house ECO. OOH. Board up window. return to HORG DG Unit. Flooding in the mens toilet. Suspect urinals |
|
Cox Green Library & Parish Office Call outs 1 | ECO. Fault with yale lock or door out of alignment |
|
Cox Green School Call outs 8 | Leaking Saniflo unit to disabled toilet | | Faulty window catchs to reception windows | | Investigate roof leak to metalwork block | | Replace 2 restricting hinges to upvc windows and 1 no. lock to door to science block | | Lower Boys Toilet. Leak from pan or other pipework | | Roof leak to Jean Hood's office coming by the window | | 3 no. broken DG Units. HORG | | ECO. Suspected blocked drain serving headmaster's office |
|
Data House 5129 Call Outs 3 | ECO. Resecure boiler house door | | ECO. Blocked WC to basement toilet | Broken toilet seat to gents toilet, 2nd floor Dedworth Middle School Call outs 1 ECO. Replace tarpaulins on roof |
|
Drug Action Team Call Outs2 | Fault with loft ladder on first floor | | Rectify faulty window |
|
Ellington Primary School call outs 4 | Roof repair to year 6 corridor using high performance cap sheet 30m2 | | Check all foul drains between dining hall / rear gate. Possible jetting required. | | Roofing / ceiling repairs Faulty ball valve to roof tank |
|
Family Centre Call Outs 6 | Refix wooden shelf to wall in office No.1 | | Noise from staff toilet Building 20 when flushed | | Investigate noisy pipes when toilets are flushed | | resecure cover to bath pipework | | Locks kitchen cupbaord and staff toilet Re-secure stair gate |
|
Furze Platt Infant School Call outs 7 | ECO. Flat roof leaking above servery | | Dripping hot tap to kitchen basin | | Dripping cold tap to kitchen sink to school kitchen | | Investigate leaking flat roof above main entrance | | Remove school sign | | Replace 2 metal drain covers by the kitchen ECO cannot turn off tap |
|
Gloucester Road Shopping Parade Call outs 1 | Reinstate metal drainage grille in footpath in front of Tops Marquees |
|
|
Hines Meadow Car Park Call outs 16 | Re-fix metal plate to floor in lower ground car park. | | Re-fix railing by disbled / trolley bays on 4th floor. | | Re-fix metal bar with new fixings into concrete | | Concrete in 1 x 6ft fence panel | | Re-fix bolts to toilet seat in tope office | | Work carried out as recall of P020259. (WB 11879) extended waste so as not to run on to floor. | | Repair damaged render on cra park wall at level 4/5 | | Re-fix door handle to Sainsbury's side stairwell on level 4 | | HORG wooden door to level 5 | | ECO. Flooding from toilet to the supervisor's office | | Broken floor tile to stairwell on 1st floor | | Replace missing floor tile to Crown Lane stairwell between ground and first floor | | Supply and Fit 2 sections of handrail | | Make safe / reglaze 2 panels in wooden door Grd. Flr. & 1 level 7 | | Re-secure cushion flooring at level 5 fire exit stairwell | | WC to old office. Cistern will not stop when full |
|
Holy Trinity Primary School Call outs 1 | Investigate and rectify loss of flow to cold water taps to kitchen sinks |
|
Holyport Manor Call outs 3 Floor to repair to entrance of terrapin Floor to repair to entrance of terrapin | ECO. Blockages to staff ladies RH pan + uppr.Jnr. Girls | | HORG DG Unit to hall. |
|
Larchfield Primary & Nursery School Call outs 4 | Leak from middle cubicle of boys toilet | | Blocked toilet in nursery + not flushing | | Replace 1 nr. Broken paving slab by kitchen Intermittent problem with overflow in the water tank tower |
|
Lowbrook Primary School Call outs 3 | ECO. Blocked drains affecting toilets by Mercury Class | | Blocked toilets to Foundation Class | | Repair cold tap to medical room | | Leak on Urinals in Year 6 |
|
Maidenhead Library Call outs 1 | Clear blockage to public ladies toilet on 1st Floor |
|
Maidenhead Nursery | Re-secure carpet strip between entrance and The Yellow Room | | Replace 3 sets of taps to basins in childrens toilet | | faulty window hinge in the blue room | | Repair or replace bottom panels to timber entrance doors to The Blue Room | | Expose joists and brickwork and allow to dry |
|
|
Maidenhead Project Centre Call outs 2 | Leak under sink in 1st toilet where taps are connected ECO Leaking toilet |
|
Maidenhead Shopmobility Call outs 1ECO. | Repair / replace mixer tap |
|
Nicholsons Car Park Call Outs 2 | Re-bed 2 kerb stones | | Re-fix hinges to door / frame level 5 stairwell to Kings Street |
|
Norfolk House Call outs 4 | Toilet not flushing to upstairs bathroom | | ECO. Fault with lock to fire exit door | | Fit notice boards, cabinets etc | | Fault to toilet door |
|
Oaken Grove call outs 1 ECO. Blocked drains with sewage leaking. Oldfied Primary School Call outs 1 upvc door not closing properly |
|
Pinkneys Green Y&C Centre Call outs 4 | Repair broken T piece under sink in gents toilet | | Re-glaze window to coffe bar | | ECO. OOH. Board up large window to coffee bar. Hand Driers |
|
Rawcliffe House Call outs 2 | Faulty flush mechanism to disbaled toilet on ground floor | | ECO. Blocked foul drain. M/H is full and cover lifting within car park |
|
Ross Road Shooping Parade Call outs 3 | Faulty flush mechanism to disbaled toilet on ground floor | | ECO. Blocked foul drain. M/H is full and cover lifting within car parkECO. Blocked drains to rear of parade. Report required |
|
St. Edmund Campion CP School | ECO.. HORG 1 pane o external door | | Fault with window to office. Glass dropping out! | | Damaged steps and handrails to infants portacabin |
|
St. Edmund's House Pru calls 2 Broken sash cord to upstairs window in Sandy Brown's OfficeWooden sash window will not close nad has gaps all around on 1st floor |
|
St. Ives House Call outs 20 | Remove blinds from filing area on 2nd floor. Relocate to window by Joanna Wass | | Install large notice board to 2nd floor office | | Clear blocked sink to 4th floor kitchen | | Replace mixer tap to eash basin in gents toilets on first floor | | Clear blocked urinals to first floor gents toilet | | ECO. Bloked ladies toilets on 2nd floor | | Blocked urinals second floor | | Broken flushing handle to first floor ladies toilets | | Hot tap leaking to 3rd floor kitchen | | Fix 2 no. notice boards to psychology office | | Broken flushing mechanism 1st Flr. Ladies | | Replace broken mixer tap to ladies wash hand basin on 1st floor | | repair / replace faulty hot tap to 3rd floor kitchen | | patch repair to tarmac at rear of building | | Reinstate plinth to kitchen unit on 3rd floor | faulty pop up waste to sink in gents toilets on 1st floor Insta 1 notice board and relocate 1 to 1st floor HR Office | ECO. Blocked urinals gents toilets 4th floor | | Install shelf to education psychology office.ECO. Blocked urinals 4th floor. Flush mechanism ladies toilet 3rd floor |
|
|
St. Mary's Catholic School Call outs 2 | Upvc window on ground floor will not close | | ECO. Lead stolen off flat roof. Make watertight + report on findings |
|
St. Mary's House Call outs 2 | Replace 2 hot taps on 3rd floor. | | Replace faulty flushing mechanism to 2nd floor ladies toilet. LH cubicle. |
|
St.Edmunds House Pru Call outs 1 | Adjust wooden door to kitchen. Not closing |
|
St.Mary's Catholic School Call outs 2 | Clear 2 road gullies and drains from them in car park | | ECO. Cannot secure upvc door to Miss Oats classroom |
|
St.Marys House Call outs 1 | ECO. Leaking urinal waste |
|
Stafferton Way Car Park Call outs 1 | HORG 2 panes to front stair entry door |
|
Tinkers Lane Depot Call outs 2 | Fit new macerator to gents toilet | | ECO. Leak from rear of gents toilet |
|
Town Hall Call outs 52 | Faulty flushing mechanism | | Faulty panic bar to timber doors in Desborough Suite | | Blocked disabled gents toilets to CSC rear office | | Remove section of cupboard for cables / air flow in CEO's office | | Blocked urinals First Floor | | ECO. First floor ladies toilets. Blocked | | ECO. Remove section of tubular barrier by flower beds | | Remove / refit key safe as instructed by Imogen Leonard | | Drill a hole within internal wall of CSC reception for cabling | | Fit door handles to ladies changing room | | ECO. Fit door closer to disabled toilet door | | Faulty hot water tap in ladies toilet | | ECO. Faulty cold water push tap to 2nd basin in to ladies toilet | | ECO. Blocked sink to Desborough suite kitchen | | clear outside drain guley by Desborough kitchen | | Replace defective handle to metal roller cupboard door | | Re-instate metal sliding door to kitchen cupboard | | Clear blocked WC to disabled toilet to Desborough Foyer | | Broken flush mechanism to ladies toilets | | Faults with 2 hot and 2 cold taps in Desborough suite kitchen | | Replace Hot tap and secure Cold tap to Revs & Benefits kitchen on 1st floor. | | ECO. Blocked disabled toilet to ground floor | | ECO. 1st floor ladies toilets. Blocked WC rhc | | Blockage To Gents Toilet | | Install white board to CSC rear office | | ECO. Blocked urinals on 2nd floor | | Remove pin board. Install 1 white board to room 112E + 1 in Room 113 | | Blocked toilet to disabled toilet CSC rear office | | Repair or replace ohc to Ascot Room | | Re-fit ceiling tiles and light fitting & sensor | | Fault to hot water tap in ladies toilet 1st floor | | ECO. Clear blocked gents toilets on 2nd floor | | Secure timber over council chamber doors | | Install 4 no. notice boards in Benefits Office 1st Floor | | ECO. Blocked WC to disabled toilet in rear office of CSC ground floor | | Blocked WC to gents toilets on 2nd floor | | Blocked disabled WC to the CSC | | ECO. Blocked gents toilet on 2nd floor | | Make good damaged wall to inside of door to members car park | | blocked disabed toilet | | Blocked sink in ladies toilets on 1st Floor by Council Chambers | | Desborough Suite resecure carpet | | Blocked Kitchen Sink | | fault with pump to kitchen sink on 2nd floor | | Decorate the Media Centre ground floor | | ECO. Blocked WC to CSC rear office | | Repair / replace cold tap in first aid room on 1st floor | | S&F toilet seat to disabled toilet first floor | | blocked urinal, 1st floor gents toilets ECO. Leak to riser duct at South End Remove wall tiles, replace with MDF ECO. Board up / make safe broken window to register office ECO. Leaking WC to 2nd floor gents toilets. Leak to left hand urinal on 2nd floor Install anchor fixing to cat ladder to roof of Town Hall |
|
The Quadrant Call outs 1 Roof leak affecting front office and suspended ceiling Victoria Street Car Park Call Outs 1 ECO. HORG 1 pane to fire door |
|
Waldeck House Call Outs 5 | fit 2 no Evac chairs | Replace 2 hot tps. 1 to ground floor ladies, 1 to cleaning cupboard, ground floor, North End. ECO. Leak to riser duct at South End ECO. Blocked urinals on 2nd floor ECO Damaged pipework to 1st floor gents toilets |
|
| ECO. Blocked urinals on 1st floor |
|
Waltham St. Lawrence Primary Call outs 2 | Clear blocked drains outside class Various plumbing faults |
|
Wessex Primary School Call outs 1 | Unblock sink / drain from kitchen |
|
Wessex Way Shopping Parade Call outs 6 | Re-set 8 slabs around a tree in front of restaurant | | Re-set bollard and surrounding slabs | | Resecure rear door | | Repair broken RWP | | Repair leak to flat roof |
|
White Waltham School Call outs 3 | Leaking piprework to girls toilet | | Leaks from boys and girsl toilets | | Man hole cover stolen at front of school |
|
Woodlands Park Call outs 4 | HORG 1 no double glazed unit to base 2 class | | 2 hot taps dripping to double sink | | Year 6 toilet. Pan leaking. ECO. Leak to sink in nursery |
|
York Stream House call outs 5 | HORG 1 pane to 4th floor window | | Door dropped to 2nd floor office | | ECO. Blocked urinals to ground floor | | Refix handle to 4th floor window | | Repair / replace 2 no faulty door closers Re-secure 2 no. carpet tiles by Rob Lewin's desk on 4th floor |
|
|
|
|
|
|